NRS Break Down Side Rail Kit
|
Break Down
Side Rail Kit Components:
- (2) 6" Solid Aluminum Rod
- (4) 5/16" X 2" Bolts
- (4) 5/16" Nuts
|
 |
Directions
- Determine the length at which to cut your side rails. Take into consideration
that the solid rod will protrude 3" when the frame is broken down.
- Cut side rails at your determined length and "Deburr" where
you've just cut using a deburring tool or a file on both the inside
and out, insuring a good fit.
- Insert solid aluminum rod halfway into the pipe. Secure the rod with
tape to hold in place while drilling.
- Measure 1.5" from the edge of the side rail; find the center
and punch for drilling.
- Using a 5/16" drill bit, drill through both the pipe and the
solid rod, deburr holes and install the bolt.
- Insert the completed half into the remaining pipe. Repeat steps 4
and 5 for the second half, keeping both bolts in the same place.
- Securely tighten ONLY the bolt on the side rail portion in which the
solid rod-coupler will remain. Slip the two halves together and gently
Snug the second bolt.
** Note: Do not over tighten! This could possibly "Ovalize"
the pipe and cause difficulty in removing and re-seating the solid rod
back into the side rail.
|